Commissioning Checks
Before commissioning the equipment read the Warnings section of this document.
Complete the following essential tasks BEFORE switching the system ON for the first time:
-
Ensure compliance with permissible installation position.
-
Verify the device is mounted correctly and securely.
-
Verify the device and wiring are all undamaged.
-
Ensure the cables are strain-free.
-
Ensure the device is connected properly, with all its inputs and outputs complete. All screw terminals are properly tightened. All connectors seated correctly.
CAUTION:Test the power supply to ensure it is “24VDC ± 10%” before wiring to the board.
CAUTION:Failure to test the suitability of the power supply BEFORE first power on could result in irreversible product damage that is NOT covered by warranty.