Commissioning Checks

Before commissioning the equipment read the Warnings section of this document.

Complete the following essential tasks BEFORE switching the system ON for the first time:

 

  • Ensure compliance with permissible installation position.

  • Verify the device is mounted correctly and securely.

  • Verify the device and wiring are all undamaged.

  • Ensure the cables are strain-free.

  • Ensure the device is connected properly, with all its inputs and outputs complete. All screw terminals are properly tightened. All connectors seated correctly.


    CAUTION:Test the power supply to ensure it is “24VDC ± 10%” before wiring to the board.



    CAUTION:Failure to test the suitability of the power supply BEFORE first power on could result in irreversible product damage that is NOT covered by warranty.